Two Papers on Applications of Stochastic Processes to Road Traffic Problems: Delays on a Two-Lane Road
随机过程在道路交通中的应用:双车道道路的延误AI 解读 ↓
本页整理公开书目信息,不生成学术质量评分。AI 解读根据题名及所注明的摘要或原文片段生成,未完成全文核验,可能有误;具体假设、证明与结论请核对原文。摘要保留来源文本,未经模型改写。
DOI 首次登记不等于接收或发表日期。部分更正、评论等条目没有独立摘要;缺少可靠材料时保留待补状态。
引用量采用 OpenAlex 单条关联记录,不合计多个记录;关联记录可能包含正式发表版本,不等于此版本单独引用。缺失不视为零,引用指标不代表论文质量。
关注作者按书目中的完整姓名匹配,同名和姓名变体需人工辨别。相关论文先按共享细分方向和具体方法排列,再参考通用方法与发表日期。
AI 根据所提供的论文材料归类:摘要研究交通随机过程与超车延误,没有涉及经济结构估计、因果识别或所列宏观金融方向。
反馈分类问题随机过程在道路交通中的应用:双车道道路的延误AI 解读 ↓
正在核对关联版本…
正在核对对应版本的资源…
SUMMARY A theoretical formula is found for the average speed achieved over a long journey by a vehicle travelling along a road according to certain rules governing overtaking, when the other traffic on the road is postulated to be of a particularly simple kind. Except for the vehicle whose behaviour is studied, vehicles in each direction travel at the same speed, and are spaced at random, but with a certain minimum distance between vehicles. The vehicle being studied wishes to travel faster than the other vehicles; when it overtakes, it must pass the whole of a bunch of vehicles at minimum spacing in a single manoeuvre. It overtakes without delay if there is a sufficient gap in the opposing traffic. If delay occurs, then a greater gap in the opposing traffic is required, to allow for time lost in accelerating. An alternative application of the theory is to one half of a dual carriageway, in which the two traffic lanes are occupied by vehicles travelling at two different speeds. A curious feature of the results is that when the traffic flows increase beyond a certain level, appreciably below the theoretical capacity of the road, the fast vehicle cannot maintain a higher average speed than that of the other vehicles: the whole time is spent waiting for opportunities to overtake, and the average wait per overtaking becomes infinite. Numerical values of the average speed have been tabulated using an electronic computer. Standard values of all the constants of the model were selected for two-way and one-way roads separately, and these constants were then varied two, three or four at a time. Two general conclusions are indicated by the numerical results. Firstly, more acceleration, obtained at the expense of reduced maximum speed (and perhaps greater fuel consumption) by lowering the top gear ratio, would probably provide increased mean journey speeds for most modern cars under typical traffic conditions. Secondly, the cutting of safety margins and clearances when overtaking would not normally provide any worthwhile increase in mean journey speed.