Bayesian Forecasting of Economic Time Series
经济时间序列的贝叶斯预测AI 解读 ↓
本页整理公开书目信息,不生成学术质量评分。AI 解读根据题名及所注明的摘要或原文片段生成,未完成全文核验,可能有误;具体假设、证明与结论请核对原文。摘要保留来源文本,未经模型改写。
DOI 首次登记不等于接收或发表日期。部分更正、评论等条目没有独立摘要;缺少可靠材料时保留待补状态。
引用量采用 OpenAlex 单条关联记录,不合计多个记录;关联记录可能包含正式发表版本,不等于此版本单独引用。缺失不视为零,引用指标不代表论文质量。
关注作者按书目中的完整姓名匹配,同名和姓名变体需人工辨别。相关论文先按共享细分方向和具体方法排列,再参考通用方法与发表日期。
AI 根据所提供的论文材料归类:摘要明确讨论经济时间序列预测、外部事件引起的行为变化及后验模型加权。
经济时间序列的贝叶斯预测AI 解读 ↓
正在核对关联版本…
正在核对对应版本的资源…
A model is suggested to forecast economic time series. This model incorporates some innovative ideas of Harrison and Stevens [20] for building into the forecasting process important external shocks to the systems. Thus the occurrence of possibly significant real-world events may cause a fundamental change in the time series in question. The Jeffreys-Savage (JS) Bayesian theory of hypothesis testing is used to test the hypothesis that a particular event has been such as to free the series from its immediate past behavior. When the event frees the series in this way, then we model the sequence of observations following such an event (until the next such event) as an exchangeable sequence. In the simplest case of 0–1 valued data, such as in recording the ups and downs of the value of a particular commodity or stock, our alternative hypothesis is a Pólya process, and the null hypothesis is a simple random walk (unit roots model) with p = .50. Any exchangeable sequence is strictly stationary, and the observations in the Polya process are positively correlated, which can give rise to “explosive” behavior of the series at isolated time points. We then use the JS theory to predict future observations by taking a weighted average of the optimal predictions for each model, with weights given by the posterior probabilities of the hypotheses. Results of simulation studies are presented which compare the predictive performance of the fully Bayesian method based upon the JS theory with those based upon the “ p -value” or pre-test method. The de Finetti method for scoring predictions is used to assess their empirical performance. A theoretical methodology, which extends the “evaluation game” of Hill [28,37], is developed for comparing predictors.
具有结构突变干预的方向位移 Dirichlet ARMA 组成时间序列模型
Compositional time series frequently exhibit structural breaks due to external shocks, policy changes, or market disruptions. Standard methods either ignore such breaks or handle them through fixed effects that cannot extrapolate beyond the sample, or step-function dummies that impose instantaneous adjustment. We develop a Bayesian Dirichlet ARMA model augmented with a directional-shift intervention mechanism that captures structural breaks through three interpretable…
结构不稳定下预测交叉验证的分析
When forecasting with economic time series data, researchers often use a restricted window of observations or downweight past observations in order to mitigate the potential effects of parameter instability. In this paper, we study the problem of selecting a window for point forecasts made at the end of the sample. We develop asymptotic approximations to the sampling properties of window selection methods, and post-window selection point forecasts, where there is local…
结构突变模型中的相关参数变化
Structural break time series models, which are commonly used in macroeconomics and finance, capture unknown structural changes by allowing for abrupt changes to model parameters. However, many specifications suffer from an over-parametrization issue, since typically all parameters have to change when a break occurs. We introduce a sparse change-point model to detect which parameters change over time. We propose a shrinkage prior distribution, which controls model parsimony…
利用消息传递算法进行高维宏观经济预测
This article proposes two distinct contributions to econometric analysis of large information sets and structural instabilities. First, it treats a regression model with time-varying coefficients, stochastic volatility, and exogenous predictors, as an equivalent high-dimensional static regression problem with thousands of covariates. Inference in this specification proceeds using Bayesian hierarchical priors that shrink the high-dimensional vector of coefficients either…
时变方差下协整非平稳时间序列的预测
In cointegrated vector autoregressive (VAR) models, error correction terms often have indeterminate effects on forecasting, thus we are concerned with inclusion or exclusion of the cointegration relation in forecast. This paper considers the model averaging strategies for cointegrated VAR models with heterogeneous variance or variance breaks. The estimated cointegration rank along with other data information are used to formulate the model averaging weights. This specific…
长自回归何时能够吸收被忽略的参数变化?
To construct forecasts for time series exhibiting breaks, the paper examines long autoregressions, where the number of lags is growing with T , and possible breaks are simply ignored. The paper shows that the OLS estimators are still elementwise consistent for the true autoregressive coefficients when neglecting a break in mean, but the sum of the estimators converges to unity. Thanks to this unit-root like behavior of the fitted model, the resulting conditional forecasts…