跳到正文
收录说明
收录范围
保留计量方法研究、相关统计基础,以及实质涉及计量方法的应用、教程、比较和综述。书评、刊务及明确无关内容不公开;身份或相关性证据不足的记录保留待核,补充可靠材料后可重新判断。
当前期刊来源见下方官网链接及期刊目录。综合经济学与金融期刊逐篇筛查计量方向,证据不足时暂不公开。正刊、在线优先论文和已核实接收稿合并展示;按标题、可靠摘要、目录及身份匹配的出版社 JEL 分类核验相关性;计量类 JEL 与摘要相互印证,无 JEL 不直接排除。历史回补以可取得的注册题录和目录为准,不等于覆盖全部纸本。
日期与排序
默认按最近发表排序:正刊使用刊期,待刊使用上线日期;缺少上线日期时,排序参考登记或首次收录时间,并在卡片注明。更多筛选可选择出版状态和日期口径;卷期依据出版社元数据,不因待刊时间较长而推定已编入正刊。仅有月份或年份时,日期区间相交也会纳入。

日期精度:到日 0 篇 · 到月 1673 篇 · 到年 425 篇 · 未提供 14 篇

分类与引用
领域和方法依据题名、摘要初步分类,可人工修正;分类不代表论文质量。引用数采用 OpenAlex 单条关联记录,不合计版本。
更新与 AI 解读
正常题录、可靠摘要与引用同步继续;日、周、月简报按核实的发表与修订日期汇总,历史补录保留在文献库。AI 解读依据可靠摘要或已核实原文片段,已有解读保留供阅读参考;缺少可靠材料的条目保持待解读,浏览页面不会触发生成。
2,112 篇论文
导出
BibTeX ↓RIS ↓RSS 订阅 ↗

The Structure of Technology Over Time: A Model for Testing the "Putty-Clay" Hypothesis

生产技术的跨期结构:检验 putty-clay 假说的模型

This paper develops an econometric model of production technology in terms of the ante-ex description of production possibilities. Ex ante and ex post substitution characteristics are allowed to differ from one another and parametric representations are derived which provide arbitrary second-order approximations to the true underlying characteristics. Nested in the maintained model are the specialized putty-putty, puttyclay, and structures of technology; and hypothesis tests…

AI 解读阅读原文 ↗BibTeX ↓

Bounds for the Bias of the Least Squares Estimator of @s^2 in the Case of a First-Order Autoregressive Process (Positive Autocorrelation)

正自相关一阶自回归过程中 σ² 最小二乘估计量的偏差界

H. Neudecker, Bounds for the Bias of the Least Squares Estimator of @s^2 in the Case of a First-Order Autoregressive Process (Positive Autocorrelation), Econometrica, Vol. 45, No. 8 (Nov., 1977), p. 2006

AI 解读阅读原文 ↗BibTeX ↓

The Estimation of Choice Probabilities from Choice Based Samples

基于选择结果抽样的选择概率估计

Ti-H CONCERN of this paper is the estimation of the parameters of a probabilistic choice model when choices rather than decision makers are sampled. Existing estimation methods presuppose an exogeneous sampling process, that is one in which a sequence of decision makers are drawn and their choice behaviors observed. In contrast, in choice based sampling processes, a sequence of chosen alternatives are drawn and the characteristics of the decision makers selecting those…

AI 解读阅读原文 ↗BibTeX ↓

A Note on Distributed Lags, Prediction, and Signal Extraction

关于分布滞后、预测与信号提取的说明

A wide variety of economic models include as explanatory variables either expectational variables or variables representing the result of some decision-making process. The first category includes both expectations about the future values of variables, e.g., next period's sales, the level of unemployment two quarters ahead, etc. and other subjective variables such as permanent income or the "normal" level of prices and interest rates. Examples of the second type are "desired"…

AI 解读阅读原文 ↗BibTeX ↓

A General Theorem in the Theory of Asymptotic Expansions as Approximations to the Finite Sample Distributions of Econometric Estimators

计量经济估计量有限样本分布渐近展开近似的一般定理

P. C. B. Phillips, A General Theorem in the Theory of Asymptotic Expansions as Approximations to the Finite Sample Distributions of Econometric Estimators, Econometrica, Vol. 45, No. 6 (Sep., 1977), pp. 1517-1534

AI 解读阅读原文 ↗BibTeX ↓

Pooled Time-Series Cross-Section Estimation

时间序列与截面数据的合并估计

PROGRAMS ARE AVAILABLE to facilitate calculation of least squares and instrumental variable coefficients and related statistics from data consisting of time-series observations for each of several cross-sectional units.' The (FORTRAN) programs2 must be used with the SPEAKEASY/FEDEASY processor3 and take the form of three FEDEASY commands that (1) form a moment (cross product) matrix from an arbitrarily large number of observations (CPMATRIX), (2) calculate least squares and…

AI 解读阅读原文 ↗BibTeX ↓

Multiple Time Series Analysis and the Final Form of Econometric Models

多重时间序列分析与计量经济模型的最终形式

Univariate autoregressive moving average models for the endogenous variables of a dynamic simultaneous equations system can be interpreted as a form of solution of that system. This paper considers the interrelationships between the various representations of the system, and develops joint estimation and model selection procedures for the multiple time series model which arises as a multivariate representation of the individual autoregressive moving average models. A test of…

AI 解读阅读原文 ↗BibTeX ↓

Existence of Stable Distributed Lags

稳定分布滞后的存在性

This paper attempts to determine conditions under which distributed lag analysis is appropriate. Results indicate that lag functions are stable and linear under fairly general (but constant) objective criteria and decision constraints as long as the underlying economic environment is characterized by a stationary Gauss-Markov process, and observed environmental variables are Gaussian perturbations of that process. The results appear particularly useful for specifying the lag…

AI 解读阅读原文 ↗BibTeX ↓

Tests of Equality between Sets of Coefficients in Two Linear Regressions when Disturbance Variances are Unequal

扰动方差不等时两组线性回归系数相等的检验

is misleading if o-2 $ o-2 and n, and n2 are both small, where Y, and Xi are ni x 1 and ni x k observation matrices, ,li is a k x 1 coefficient matrix, and ei is an n, x 1 error matrix for i=1,2. A valid asymptotic test may easily be obtained by regarding (1) and (2) as seemingly unrelated regression equations. In this paper we establish a small sample test which may readily be extended to a test of some of the coefficients in the two regressions.

AI 解读阅读原文 ↗BibTeX ↓

Inferential Procedures in Nonlinear Models: An Application in a UK Industrial Cross Section Study of Factor Substitution and Returns to Scale

非线性模型的推断程序:英国工业截面中的要素替代与规模报酬

Grayham E. Mizon, Inferential Procedures in Nonlinear Models: An Application in a UK Industrial Cross Section Study of Factor Substitution and Returns to Scale, Econometrica, Vol. 45, No. 5 (Jul., 1977), pp. 1221-1242

AI 解读阅读原文 ↗BibTeX ↓

Conflict among Criteria for Testing Hypotheses in the Multivariate Linear Regression Model

多元线性回归模型中假设检验准则的冲突

This paper surveys alternative testing criteria in the linear multivariate regression model, and investigates the possibility of conflict among them. We consider the asymptotic Wald, likelihood ratio (LR), and Lagrange multiplier (LM) tests. These three test statistics have identical limiting chi-square distributions; thus their critical regions coincide. A strong result we obtain is that a systematic numerical inequality relationship exists; specifically, Wald , LRa LM.…

AI 解读阅读原文 ↗BibTeX ↓

The Asymptotic Properties of a Maximum Likelihood Estimator for a Model of Markets in Disequilibrium

非均衡市场模型中极大似然估计量的渐近性质

Michael J. Hartley, Parthasaradhi Mallela, The Asymptotic Properties of a Maximum Likelihood Estimator for a Model of Markets in Disequilibrium, Econometrica, Vol. 45, No. 5 (Jul., 1977), pp. 1205-1220

AI 解读阅读原文 ↗BibTeX ↓